Implementation of the new legal obligations for the industry related to Integrated Pollution Prevention and Control.

According to the Law on Environment, as of January 1, 2006, the implementation of new legal obligations for the industry related to Integrated Pollution Prevention and Control (IPPC) has begun. This permit system is covered by two chapters in the law: Chapter XII – Integrated Environmental Permits and Chapter XIV – Permits for Compliance with Operational Plans.

The deadline for submitting applications for Type A Integrated Environmental Permits has already started, and the first six-month period applies to installations for metal production and processing, as well as leather tanning (01.01.2006 to 01.07.2006).

The schedule for submitting applications for Type A Integrated Permits for the entire industry is determined by the Regulation on defining the activities of installations for which integrated environmental permits or compliance permits with operational plans are issued, as well as the timetable for submitting applications for compliance permits with operational plans (Official Gazette 89/05).

Operators of existing installations must submit applications for permits to comply with operational plans. The type of document (A or B) depends on the capacity of the installation. Applications for integrated environmental permits are submitted for new installations.


ANNOUNCEMENT for submitting applications for permits to comply with operational plans

Payment of the fee for submitting the application to obtain the permit for compliance with the operational plan or for holding the permit.

The payment is made to the Ministry of Environment and Physical Planning:
Treasury account (depositor: National Bank of the Republic of Macedonia) 1000 000 000 630 95
Payment account: 1210115202 631 – 10
Program C Subprogram S1
Revenue account 718 136
EMBS – 52 62 887

 

 

In accordance with the Law on Environment, as of January 1, 2006, the implementation of new legal obligations for the industry began, related to Integrated Pollution Prevention and Control

Technical sectoral guidelines prepared by the Commission for Best Available Techniques

 

 Guideline on Fees for IPPC

 

 Sectoral Guidelines for BAT (Best Available Techniques)

 

 Technical sectoral guidelines for BAT prepared by the BAT Commission

 

 

 

 

 

Forms for IPPC – (Integrated Pollution Prevention and Control), and guidelines for completing them

 

Forms for obtaining an IPPC permit and guidelines for completing them

 

Documents required for submitting an application and obtaining a permit are:

Depending on the type of installation and the purpose of the application, you can download one of the following documents:

These documents are part of the Rulebook on the procedure for issuing permits for compliance with the operational plan, the Rulebook on the procedure for obtaining a Type A Integrated Environmental Permit, and the Rulebook on the procedure for obtaining a Type B Integrated Environmental Permit (Official Gazette No. 4 of 2006).

 

 

 

 

 

 

 